close
close

B1 at Dortmund is closed for bridges

B1 at Dortmund is closed for bridges

For the bridge between the bridges, the Bundesstraße is completely closed 1 hour later (8 p.m.) in Dortmund. Bis Montagfrüh (5.00 Uhr) is the most important representative of the Anschlussstellen Holzwickede and Dortmund-Sölde that can no longer breed, with the sister Planungsgesellschaft Deges angekündigt hat.

If the Umleitung is a major Umfahrung über the A1, A2 and the Bundesstraße B236 empfohlen. Die Brücke must be in the Zuge des Ausbaus der Bundesstraße zur Autobahn weichen.

B1 east of Dortmund is A40

A kilometer longer distance from the B1 goes in the Bundes direction to the A40 in Dortmund Ost and the Kreuz Dortmund/Unna. The planer will be released in 2025 with a sales volume of up to 100,000 vehicles and will be available for purchase. Der Ausbau soll 2027 abgeschlossen signal.